Riot Color India team feels proud to achieve another milestone by completing a large format signage project at Sundrop Society near Biswa Bangla Gate in New Town, Kolkata. The project involved many steps such as designing, fabrication and installation of LED signage that now stands as a landmark for the entire society. The LED signage was installed approximately 50 feet above the ground where each letter is almost 3 feet high. Our team engineered the signage to make it visible from a distance while maintaining the structural integrity, illumination, and durability. In this case study, we have outlined the project objectives, scope, challenges, and solutions that define our effort to successfully execute the Sundrop Signage project.
One of the primary objectives of this project was to create a sharp and vibrant large scale LED signage that would be the visual identity of the Sundrop society and serve as a landmark near the Biswa Bangla Gate. Take a look at the key objectives of the project –
The scope of the project included all steps of the signage starting from conceptualization, designing, fabrication, to installation.
Conceptualization
Designing a signage layout with 3 feet height of each letter, calculated to align proportionally with 50 height of the installation.
Developing a robust structural framework that supports the heavy signage at height while withstanding all types of weather conditions.
Installing approximately 2200 LED lights across the letters for reflecting brightness and vibrancy of the signage and creating a spotlight like appearance during the nighttime.
Setting up the wires and control systems requires enough power to manage 2200 LED lights efficiently.
Installing the LED signage at such a significant height required special equipment, trained manpower, and rigging.
Conducting performance testing of the sign and mandatory safety checks post-installation to ensure the signage meets the performance and aesthetic expectations.
Conducting the installation work of the LED signage at such a height of 50 feet above the ground comes with a set of challenges that require proper planning, training and technical precision. Some of the key challenges of the project include –
Installing a sign at such a height required specialized tools such as lifting equipment, scaffolding etc. along with this, it is also important to strictly adhere to safety protocols to prevent unfortunate accidents.
With almost 2200 LED lights integrated into the signage, the structure should be strong enough to bear the electrical and physical load without compromising safety and stability.
Achieving consistent brightness and maintaining a uniform color across thousands of LED lights requires proper electrical planning and high-quality and branded LED components.
Since the signage is installed outdoors and at such height, it should be made weather-resistant as well as durable against rain, wind, and temperature.
Each letter in the signage measuring 3 feet in height, requires accurate spacing and proper alignment at height, which adds more complexity to the installation process.
The Riot Color team executed the entire project of Sundrop society efficiently and overcame the challenges with years of experience, electrical specialists and excellent craftsmanship to ensure that the project was accomplished safely and on time.
To accomplish the project successfully, Riot Color India offered a set of solutions that include,
All these solutions helped the team to overcome the technical and installation hurdles efficiently and thereby delivered an LED signage that met both functional and aesthetic appeal.
The final look of the signage creates a brilliant display that grabs the attention of the passersby even from a distance. The installation at 50 feet height was a challenging task but the Riot Team efficiency accomplished the installation work, ensuring its vibrant visibility. The overall finishing, structure and visual appeal added a strong visual presence to Sundrop Society.
The Sundrop society is very much happy with Riot India’s professional approach, efficiency, excellent craftsmanship and efficient execution throughout the project. From design, fabrication to installation, the team maintained a consistent focus on quality, durability, safety and timely delivery.
The Sundrop project serves as a testament to our capability to accomplish complex large format signages efficiently. From design and fabrication to installation, the entire work reflects the Riot team’s unwavering dedication to make the impossible possible. By successfully executing installation at 50 feet above the ground with 2200 integrated LED lights, the team has shown their technical expertise, careful management, and efficient installation. This Sundrop signage near Biswa Bangla Gate now stands as a vibrant landmark.
Fill out the form and we'll get back to you soon.